Chapter 126: return to outlying islands

Chapter 126 Returning to Outlying Islands

Qu Mao has been busy for several days on the swamp landformation construction site of the two folded spaces in Yicun, Kongdao. He has also visited the southern sea area, and has a preliminary and basic understanding of the islands in the southern sea area.

The transformation of the swampy terrain may cause new problems at any time. Qu Mao had to run back and forth between the folding space and the quarry to dispatch the leaders to solve the problems anytime and anywhere.

Fortunately, after two days and two nights of busy work, the stone walls of the ditch and the reservoir have been built in the smaller folding space. The cheating system even generously rewarded 80 cheating points at once, and began to digitize the stone wall of the ditch and the stone wall of the reservoir. Unfortunately, no architectural drawings were generated for Qu Mao.

If the cheating system gives architectural drawings, then the larger folding space renovation can directly use the resource reserves in Yi Village’s territory account, and send the leaders to guard the construction to complete the construction. Reduce the construction period by reducing the number of precincts to build.

Although the stone walls of the ditches and reservoirs in the small folded space have been built with stones, the residents have worked repeatedly. At present, even the stone walls of the ditches and the walls of the reservoirs are filled with silt.

In the future, the leaders will be organized to dredge the ditches. Fortunately, after the cheating system digitizes the stone walls, the stone walls that the leaders simply pile up with stones will fully have the function of water isolation. This is also a good compensation, and the follow-up will continue It is enough to arrange for the local people to dry the silt while dredging the silt.

Arrange excellent-level qualified leaders to organize the leaders to remove the silt in the ditches and reservoirs. It is required that the depth of the ditch is 3 meters and the depth of the reservoir is 5 meters, and the depth and depth of the ditches and reservoirs should be checked regularly while drying the silt. If it is not enough, it should be dredged in time.

The excellent-level qualified leaders immediately organized the leaders to bring a large amount of firewood to the public kitchen of another village, lit twelve piles of bonfires in this small folding space, and cut out three horizontal, three vertical and six ditches to the area next to the space wall Each lit a bonfire.

Then organize the people to dump the cleared silt around the campfire. No matter how effective it is, the fluidity of the dried silt will be slightly worse, and it will always solidify slowly.

Of course, Qu Mao also allowed this excellent-level qualified leader to freely arrange the renovation project of the folding space with a slightly larger area, at least before Franklin King, the village chief, took office.

With experience in transforming small folding spaces, the leaders have more experience in transforming larger folding spaces, and they may be able to innovate independently.

After all, on the empty islands and outlying islands, the number of excellent-level qualifications is not small.

After arranging the task of transforming the swamp landforms in the two folding spaces of the empty island, and seeing initial results, Qu Mao took the naval troops and sailors and drove the ship back to the outlying island.

After sailing for about an hour, the sea boat that Qu Mao was on finally berthed at the civilian pier on the outlying island.

As soon as he got off the boat, Qu Mao saw Kong Ming waiting for him on the wooden trestle of the civil dock from afar.

Seeing Qu Mao getting off the boat, Kong Ming hurried up to meet him and said, "My lord, you are welcome back to the outlying island. Master Su Yan will also be here today."

Qu Mao nodded and said, "I know! I came back at this time."

Especially when Qu Mao mentioned the use of stone ditches and reservoir walls in the transformation of the folded space swamp terrain, Kong Ming praised with a goose feather fan: "My lord is such a fantastic idea. If my subordinates are responsible for the transformation there, it may not be Can think of such an exquisite method to build a pool with stones..."

Before Kong Ming finished speaking, the cheating system displayed before Qu Mao’s eyes again: “Congratulations to the rookie host for the successful improvement of the dam construction process, rewarding 20 cheating points. This system is digitizing this innovation!”

Qu Mao was surprised for an instant, and he didn't even bother to listen to Kong Ming's compliments. In the future, if he continued to build dams according to this specification, he might still be able to get rewards for cheating points.

Pulling Kong Ming, Qu Mao quickly climbed up the dam that had already been built. After the cheating system digitized the dam, it appeared smoother and stronger. Qu Mao could only express regret for the construction drawings.

Kong Ming continued to babble, and said, "My lord, the 20-meter-long embankment from the village should be repaired soon... Hey, why is it more solid and tidy than when I saw it last night?"

After digitizing the cheating system, the bottom of the entire embankment should be 15 meters, and there is a 2-meter-wide lining at a vertical height of 3 meters, and then go up, the top of the **** is about 3 meters wide, and it is close to the side away from the river. It is a steep stone wall with an estimated vertical height of 5 meters and a width of at most 1 meter on the facing side. There is a step down, and the steps extend to a 3-meter platform, which is equivalent to a **** of only about 45 degrees.

Qu Mao walked up to the lining platform first, and felt that although there were no steps built near the village, it was not difficult to climb up this slope.

After thinking for a while, Qu Mao said to Kong Ming beside him: "Kong Ming, the lining platform is 2 meters wide. In the future, a row of trees can be planted here. On the **** of the embankment near the village, try to plant as much grass as possible to avoid raining down the embankment." Washed away."

Kong Ming nodded and said, "Okay, my lord.

Although the subordinates don’t know that there is a barren land about 200 meters away from both sides of the river, they can plant trees and grass on the embankment to test and find out the reason.

Planting grass to prevent the dam from being washed away by rain, you are so smart, sir. "

Qu Mao thought for a while and said, "Before you go back to Yi Island, you should make arrangements with Jia Sixie. Su Yan said that she will bring Jia Sixie to be the village head when she comes this time. I don't know when she will arrive."

"Yes, my lord, the dam must continue to be repaired!" Kong Ming said.

Qu Mao nodded, found a place on the side of the embankment away from the coastline, and took out two blocks of stones with a total of 1998 units from his backpack. Although it only took up two blocks of the backpack, when he took them out and put them on the ground, there was It is a full two piles.

Kong Ming glanced at the stones, and said, "Sir, it's much better now. You see, the stones mined by the leaders from the quarry according to the actual situation, after being transported by your backpack once, are actually 1 meter long and 1 meter wide. The 0.6-meter-thick and 0.4-meter-thick regular bar-shaped stones reduced the amount of work for the local residents to build the dam facing the water by at least half."

Qu Mao slapped his thigh regretfully, annoyed in his heart: "Oh, if I knew it would be like this, I shouldn't let the leaders carry the stones on the empty island, I will move the leaders to build ditches and water storage The work of the pool walls is at least half that.

I don’t know if Su Yan will go to Sky Island first today, forget it, I might not know this if I go. "

(end of this chapter)

Subscribe
Notify about
0 comments
Intertextual Reviews
View all comments